Les fontaines
Tertiaire - Existant
Main contractor : BNP Paribas RE
Project owner: BNP Paribas RE
Delivery: 2018
Surface area: 43 000m²
more details
ENEOR Services

BREEAM commissioning 
Commissioning of the envelope

Requirements

Dual environmental certification
Guaranteed costs

AMIS CHAUFFAGE
Industriel - Existant
Main contractor : ENEOR
Project owner: AMIS
Delivery: 2016
Surface area: 35 000m²
more details
ENEOR Services

HVAC project owner for the renovation of the existing 4MW heating system.

Drawing up of a full heat balance for the site, including measurement of the process air extractor fans.

Design and...

Requirements

Study of the implementation of a water/water type heat pump in a cooling tower to allow the system to work to its full potential.

 

FOS HVAC II
Tertiaire - Existant
Main contractor : ENEOR
Project owner: ExxonMobil
Delivery: 2015
Surface area: 1 000m²
more details
ENEOR Services

HVAC project owner in design and implementation.

Requirements

Renovation of HVAC systems in an existing service-sector building.

FUTUROSCOPE - Tertiaire - Analyse de la qualité du réseau
Tertiaire - Existant
Main contractor : -
Project owner: FUTUROSCOPE
Delivery: 2015
Surface area: 82 000m²
more details
ENEOR Services

·         Electrical measurements ;

·   ...

Requirements

The 10 buildings assessed are cinemas, restaurants, hotels and attractions.

AMIS Montluçon - Mise en place des filtres anti-harmoniques - Plan MV
Industriel - Existant
Main contractor : -
Project owner: AMIS
Delivery: 2015
Surface area: 32 342m²
more details
ENEOR Services

 

·  Electrical...

Requirements

The aim was to identify and quantify energy savings using metrology and to define the necessary actions to take to achieve these savings. Following the audit, measurements showed the presence of harmonics on the site's electrical network.